Skip To The Main Content
Link School Website Header

Link will be closing all stations starting on 3-21 for system upgrades! Check back for more details!

Link Upgrades FAQ

  • Why is the system closing?

  • When is the new system going to launch?

  • What will happen to my current membership?

  • What steps do I need to take to get my membership on the new system?

  • When can I download the Link Dayton App?

  • How will I checkout bikes with the new system?

  • I use Link to get to/from work, what should I do in the meantime?

  • Will I still be able to get bikes at former Link location?

  • What bikes will be available?

  • What is an e-bike?

  • What is riding an ebike like

Feasibility Study

by Chris Buck | Mar 12, 2015
In case you have not yet seen the feasibility study that was conducted in 2013, you can find it here. The study covers what bike share is, Dayton's past initiatives, and why Dayton needs the bike share system. It is a fantastic read and will give you some great talking points about bike share. 

Feasibility Study

Feasibility Study
© 2015 B-cycle, LLC. All rights reserved. BCycle and the BCycle logo are trademarks of B-cycle, LLC.

Proudly Presented By: 

Bike Miami Valley Logo


RTA LOGO WHITE BACKGROUND